![]() These sites will not significantly impact the environment, socio-economic, and policies, also will support electricity for the new capital region for Indonesia.ĭevelopment in West Kalimantan addresses fundamental challenges related to the availability of electricity, and a Nuclear Power Plant (NPP) has been the option of renewable energy needs in the regional development plan since 2010. We discovered twelve sites, but only two suitable priority sites for NPPs were found in Ketapang after overlapping with national/regional planning and the existing state. ![]() The NPPs are proposed to operate with water reactor coolants, thereby prioritizing areas of about five kilometres from the shoreline. This study showed that West Kalimantan has a very high suitability area covering 16,321.66 Km 2 (25.81 %) for NPPs. GIS and analytical hierarchical processes (AHP) were combined to produce suitable NPPs site. ![]() This study aims to determine potential sites for NPPs using spatial-weighted multicriteria analysis. Nuclear Power Plants (NPPs) require an appropriate location in terms of biogeophysical, socio-economic, and disaster considerations. Nuclear energy is a choice to meet the electricity needs of West Kalimantan, Indonesia to support new industrial areas.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |